  Boissière, Geneva, 2002-2003
   
  Overview
Construction of an office building with three basement levels, in a congested urban site in Geneva, Switzerland.

 
 
 
  Type of Work Mandated Contract Amount Duration of Project  
Berliner Wall with projected concrete
Internal bracings and anchors
Excavation and drainage

$1,950,000 6 Months
 
 
 
  Client Civil Engineer General Contractor
 
  S.P.G
Rte. de Chêne 36
1208 Geneva, Switzerland

Pillet SA, 9 Ch. de Paris
1233 Bernex, Switzerland
Schaeffer & Bartolini SA
Rte. de Jeunes 35
1227 Carouge, Switzerland
Lucien Torelli Architecte
Chemin Esparcette 4
26, Ch. Franck-Thomas 1208 Geneva, Switzerland
 
         
  Principal Quantities
 
 
  Berliner: 70 borings at 800mm, 13m deep,
28 anchors Po= 450 kN, 18 to 25m length
1,800 m2 projected concrete wall, 25mm thickness
27,000 m3 excavation
Internal bracing 80 tons




Boissieres Project

Dirt removed , starting to
pour foundation floor
 
  Soil Type
Topsoil, clay-like silts

   
   
Boissieres Project

Creation of ramp near end
of the project
 
         