  HSBC Republic Bank Building, 37 Quai Wilson, Geneva Switzerland, 1998
 
  Overview
Construction of Three basement levels underneath an existing, historic lakefront building in Geneva, Switzerland, meanwhile leaving existing building intact (2.8 meter existing ceiling height)

 
 
 
  Type of Work Mandated Contract Amount Duration of Project  
Micropiling building support
Diaphragm wall casting


$3,000,000 9 Months


 
 
 
  Client Civil Engineer General Contractor
 
  HSBC Republic Bank (Suisse) SA
Geneva, Switzerland

Karakas & Français SA
Av. des Boveresses44
1010 Lausanne, Switzerland

Association d’Entreprises
Astié & Fils SA - Losinger
Constructions SA - Forasol SA

 
         
  Principal Quantities
 
 
  Diaphragm wall 2,500 m2, 60cm thickness,
depth 25 meters
140 Micropilings, load bearing at 500 to 700 kN,
borings 220mm diameter, steel tube reinforcement,
depth 28 meters





Boissieres Project
Quai Wilson Bank in Geneve
 
  Soil Type
Silty sands and gravel, below the groundwater level


   
 
     