  COOP City Center Vevey, 2003    
  Overview
Construction of new COOP supermarket and commercial center with 4 basement levels, in close-in urban setting, in Vevey, Switzerland.
 
 
 
  Type of Work Mandated Contract Amount Duration of Project  
Jet Grouting, Jet Curtain Grouting
Tiebacks, soil nails, internal bracing
Bored Piles
$1,900,000 6 Months
 
 
 
  Client Civil Engineer General Contractor
 
  COOP SA
Vevey, Switzerland

Karakas & Français SA
Av. des Boveresses44
1010 Lausanne, Switzerland
HRS SA
Chemin Esparcette 4
1023 Crissier, Switzerland
 
         
  Principal Quantities
  COOP City Center Vevey, 2003
COOP City Center Vevey, 2003
 
  580 jet grouted columns at 1,000mm, 20m depth
Jet curtain grouting of 2,100m2
150 soil nails at 25mm, from 6 to 10m depth
250 anchors Po= 600 kN, 18 to 25m length
50 Bored Piles of 1,000mm diameter, 20m deep
Internal bracing 70 tons


 
  Soil Type
Landfill, bedrock
Water Table
-4m
   
 
 
  Project Commentary
     
  The combination of the Jet Grouting and JetCurtain Grouting techniques, which were proposed by Forasol as a variant to the base project (diaphragm wall casting), proved to be in interesting solution.
 
     
  In effect, we were able to reduce nuisance to adjacent urban structures by reducing vibrations and truck traffic. Additionally, our solution enabled us to work directly adjacent to nearby structures without the risk of structural damage.
 
         
  Finally, our solution resulted in a significant cost reduction for the foundation solution, and met the construction timelines imposed by the client.  
         