| Retaining Walls |
||||
| Road
Trench, Collombey, 1999 - 2000 |
||||
| Overview Construction of Subterranean Road Trench for Approach to Collombey Tunnel, Collombey Switzerland |
||||
| Type of Work Mandated | Contract Amount | Duration of Project | ||
| Sheet
Steel Retaining Wall Anchor Tiebacks |
$1,700,000 | 8
Months |
||
| Client | Civil Engineer | General Contractor |
||
| Department
of Transport, Equipment and the Environment Canton of Valais, Switzerland |
Karakas
& Français SA Av. des Boveresses44 1010 Lausanne, Switzerland |
Billieux SA Martigny and Evêquoz SA Conthey, Switzerland |
||
| Principal
Quantities |
|
|||
| Sheet
Steel Retaining Wall 470 anchors at 900kN 8-9m free tendon length, 6m sealing length 8 anchors per day (150m) realized |
Subterranean Road Trench |
|||
| Soil
Type Fine silty sand, below the groundwater level |
||||
Subterranean Road Trench |
Subterranean Road Trench |
|||